
Your Partner from Concept Through Construction
21 Duke St, Suite #213, St. Catharines, ON L2R 5W1
289-815-1901 · info@OEngSolutions.ca · ontarioengineeringsolutions.ca
PEO Certificate of Authorization 100678882

York Region 2026 Roadside Safety Program
- Client
- York Region
- Location
- York Region, ON
- Timeline
- 2025 to 2026
100+
Guide rail systems assessed
90
Detailed designs constructed
2026
Construction completed
Overview
As prime consultant, OES assessed every guide rail system within York Region's 2026 road rehabilitation program and carried each one through detailed design and construction support.
Every system was assessed against the same criteria and reported in the same format, so designs stayed comparable and defensible at budget time. York Region then awarded OES the following year's program.
Scope of work
- Roadside safety assessment of each existing guide rail system
- Risk warrant analysis to the MTO Roadside Design Manual
- Detailed designs to MTO, TAC, and MASH criteria
- Standardized reports from our in-house GIS inspection application
- Engineering support through construction
More projects
All projects
York Region · 2026, construction support through 2027
York Region 2027 Roadside Safety Program
The second consecutive program for York Region: more than 110 detailed guide rail designs across 30 road sections for the Region's 2027 program.
42
Guide rails in the program
Town of Fort Erie · October 2026, ongoing
Fort Erie Guide Rail Condition Assessment
A condition assessment of the Town of Fort Erie's guide rails, with an assessment report for each one to support the Town's capital planning.

Haldimand County · April to October 2025
Haldimand County Roadside Safety Review
A comprehensive roadside safety review covering more than 1,200 km of County roads, delivered in partnership with Aspire Consulting.
Request a quote or a call to discuss your project.
Tell us what you need, or share your availability for a call. A licensed Professional Engineer will respond within one business day.